WattNode® BACnet® Installation

Typical Installation

The illustration below shows a typical installation of a WattNode BACnet meter measuring three phases and connected to a BACnet network.

Wattnode-BACnet-Three-Phase-Panel.jpg

Necessary Installation Items:

Miscellaneous Installation Items:

  • Mounting: Screws (#8 sheet metal screws recommended) or Velcro
  • Circuit Protection: One of the following
  • Line Voltage Wire (For the voltage inputs): 12-14 AWG (stranded recommended), THWN, THHN, MTW, or AWM.
  • BACnet Communication Cable: 16-22 AWG (solid or stranded), twisted, optionally shielded.