Skip to main content

Typical Installation

The illustration below shows a typical installation of a WattNode® Plus for LonWorks® meter measuring three phases and connected to a LonWorks network. Wattnode plus lonworks three Phase Panel.png

Necessary Installation Items:

Miscellaneous Installation Items:

  • Mounting: Screws (#8 sheet metal screws recommended) or Velcro
  • Circuit Protection: One of the following
  • Line Voltage Wire (For the voltage inputs): 12-14 AWG (stranded recommended), THWN, THHN, MTW, or AWM.